Investasi
Fitur
BiayaKeamanan
Akademi
Lainnya
Pluang+

Bandingkan Harga & Kinerja Bank Amar Indonesia Tbk (AMAR) vs Greenwood Sejahtera Tbk. (GWSA)

Bank Amar Indonesia TbkTrading
Greenwood Sejahtera Tbk.Trading

Kinerja harga (24 Jam Terakhir)

Statistik utama

Perbedaan Bank Amar Indonesia Tbk dan Greenwood Sejahtera Tbk.: Bank Amar Indonesia Tbk diperdagangkan di Rp218 (kapitalisasi pasar 4 T, volume 24 jam 148,7 rb), sedangkan Greenwood Sejahtera Tbk. diperdagangkan di Rp139 (kapitalisasi pasar 1,09 T, volume 24 jam 386,3 rb). Perbedaan utamanya: Bank Amar Indonesia Tbk jauh lebih besar — sekitar 3,7× kapitalisasi pasar Greenwood Sejahtera Tbk., dan Greenwood Sejahtera Tbk. lebih aktif diperdagangkan (386,3 rb vs 148,7 rb). Mana yang lebih baik tergantung tujuan investasimu.

AMARGWSA
Kapitalisasi Pasar
4 T1,09 T
Volume
148,7 rb386,3 rb
Lot
1,49 rb3,86 rb
Perputaran
32,21 jt54,18 jt
Harga Rata-rata
216,63140,25
Nilai Transaksi
32,21 jt54,18 jt
Harga Ekuilibrium Indikatif
220143
Volume Ekuilibrium Indikatif
3,6 rb18

Perbandingan imbal hasil

Imbal hasil berjalan pada periode standar

Berita terkini

Berita terbaru kedua aset

AMAR
Lihat detail
GWSA
Lihat detail

Tentang Bank Amar Indonesia Tbk

PT Bank Amar Indonesia Tbk (the "Bank"), formerly PT Anglomas International Bank, was established in 1991 based on Deed No. 32 dated March 15, 1991 of Eddy Widjaja, S.H., notary in Surabaya.

Selengkapnya di halaman AMAR

Tentang Greenwood Sejahtera Tbk.

Greenwood Sejahtera is part of KG Global Development. On the begining, the company have a relation with Jababeka group, which own the land that has been used to builit TCC Batavia.PT Greenwood Sejahtera, company that developing The City Center Batavia (TCC Batavia), on December 23, 2011. The City Center Batavia is a superblock, mix used development project on top of 2,1 hectares of land. Its first tower is a skycrapper building: a tower with 46 storey, plus an 8 storey annex. According to the masterplan, Greenwood Sejahtera will build 3 tower on the site. The other tower will be completed in 2017 and the area will be expanded to 5.4 hectares. Its ground breaking ceremony is on September 12, 2009.

Selengkapnya di halaman GWSA