Pergerakan harga dalam 24 jam terakhir
Perbedaan Adaro Energy Indonesia Tbk dan Krakatau Steel (Persero) Tbk.: Adaro Energy Indonesia Tbk diperdagangkan di Rp2.300 (kapitalisasi pasar 69,07 T, volume 24 jam 19,18 jt), sedangkan Krakatau Steel (Persero) Tbk. diperdagangkan di Rp216 (kapitalisasi pasar 4,18 T, volume 24 jam 16,47 jt). Perbedaan utamanya: Adaro Energy Indonesia Tbk jauh lebih besar — sekitar 16,5× kapitalisasi pasar Krakatau Steel (Persero) Tbk., dan Adaro Energy Indonesia Tbk lebih aktif diperdagangkan (19,18 jt vs 16,47 jt). Mana yang lebih baik tergantung tujuan investasimu.
| ADRO | KRAS | |
|---|---|---|
Kapitalisasi Pasar | 69,07 T | 4,18 T |
Volume | 19,18 jt | 16,47 jt |
Lot | 191,85 rb | 164,67 rb |
Perputaran | 44,12 M | 3,58 M |
Harga Rata-rata | 2.299,98 | 217,23 |
Nilai Transaksi | 44,12 M | 3,58 M |
Harga Ekuilibrium Indikatif | 2.300 | 216 |
Volume Ekuilibrium Indikatif | 21,49 rb | 725 |
Imbal hasil berjalan pada periode standar
Berita terbaru kedua aset
Adaro Energy , PT (the company) was established under its original name of PT Padang Karunia on Jul 28, 2004 then changed to PT Adaro Energy Tbk based on Notaries Deed dated Apr 18, 2008. The deed of establishment was approved by the the Ministry of Justice dated Apr 25, 2008.
Selengkapnya di halaman ADRO →PT Krakatau Steel (Persero) was established on August 31, 1970 as a result of Indonesian Government Regulation No. 35 in the year 1970 regarding is equity establishment. The establishment of this steel industry was started by utilizing the left over machinery of the former Russian initiated Trikora Steel Project, mainly on cold wire drawing, bar mill, and section mill.These plants were officially opened by the President of Republic Indonesia in 1977.In 1979, the operation of the facilities such as direct reduction plant (with the capacity of 1.5 million tons per annum), billet steel plant (with the capacity of 500,000 tons per annum), wire rod mill (with the capacity of 220,000 tons per annum) and infrastructure such as a steam power plant (400MW), water purifying installation, port of Cigading and telecommunications system were officially opened.In 1983 relatively large scale plants also formally started their operation, they are slab steel plant and hot strip mill.This was followed in 1991 by a merger of a cold rolling mill plant in Cilegon industrial zone, to become the production unit of PT Krakatau Steel (Persero).
Selengkapnya di halaman KRAS →